Projects AllCOMPLETEDEL-KHAYYATMARAFIQONGOINGOTHERRABIGHSABICYASREF Installation of Sales Gas Metering System & By pass line for YASREF Projects at Yanbu COMPLETED, YASREF 15 KM of Trenching, Installation of conduits mass concrete for construction of communication cable duct bank at MC-3- Al-Shalawi International Holding Company COMPLETED, YASREF 2000 M3 of Manhole preparation in J&C Co. Yanbu COMPLETED, OTHER Asphalt and Concrete Restoration work at Masa (MARAFIQ) plant-03 years’ contract COMPLETED, MARAFIQ Bird Net Repair work at YANSAB (SABIC-affiliate) PO#4300491345. COMPLETED, SABIC Bucket Elevator Casing recondition work at Arabian United Float Glass Company (AUFG) COMPLETED, OTHER Building Maintenance work at Ministry of Education (03-year contract) PO# 4301288655 ONGOING Burned House Damaged By Fire with New Replacement (Nakheel 4 Sukhrah 02- 01) at YANPET. (SABIC- Affiliate) COMPLETED, SABIC Bypass system to mitigate the current pumps discharge line leaking issue to enhance the reliability of lift station 15A – MaSa (MARAFIQ) Yanbu. PO# 9100025749 COMPLETED, MARAFIQ Carrier Self Profile SCISSOR lifts at HAMED SAUD AL OTAIBY CONTRACTING EST. COMPLETED, OTHER Chemical Cleaning jobs in SWCC Yanbu COMPLETED, OTHER Civil, Structural E& I works at ANABEEB/YASREF-Project MOC-147-PC-15-0003 (SPENT CAUSTIC PACKAGE) COMPLETED, YASREF Civil work s for Installation of permanent to add Diesel additive CFPP at ANABEEB/YASREF. COMPLETED, YASREF Civil works at Saudi Carbonate Company at YANBU.-PO# 05669-01 COMPLETED, OTHER Civil works at YASREF plant. COMPLETED, YASREF Civil Works for Gypsum Board Line-2 work at United Mining Industries -PO# 550745-5 COMPLETED, OTHER Civil works for the construction of the foundation for the new land plaster mill GP plant work at United Mining Industries -PO# 551174-7 COMPLETED, OTHER Civil works for Valve Box Chambers for YASREF Project at Yanbu. COMPLETED, YASREF Cleaning and polishing for Vehicle work at YANSAB (SABIC-affiliate) PO# 4300536866 COMPLETED, SABIC Cleaning ETP Pond at IBN RUSHD Plant(SABIC- Affiliate) COMPLETED, SABIC Concrete Slab works at El Khayyat Gypsum Plant –Yanbu COMPLETED, EL-KHAYYAT Construction of a New Electrical Room and Supply & Installation of ACS work at Carbonate Company Ltd- Yanbu. PO# 05969-2 COMPLETED, OTHER Construction of AL-BIARIQ expansion project – Calcium Chloride CaCl2 Granulation Plant COMPLETED, OTHER Construction of Box Culvert at YIC Drainage Channel Works at ROYAL COMMISSION COMPLETED, OTHER Construction of Civil workshop at BONATTI S.P.A BRANCH- YASREF (SP-4) Project-Yanbu COMPLETED, YASREF Construction of hot end office, general toilet and shift superintendent office work at Arabian Glass Factory (AUFG) COMPLETED, OTHER Construction of RCC culvert on T-6 LIVE GAS PIPE LINE at Al Shalawi- YASREF (MC-3) Project-Yanbu COMPLETED, YASREF Construction of Shed Over loading Silica sand hopper work at United Mining Industries -PO# 512442-4 COMPLETED, OTHER Construction of the control panel room work at United Mining Industries -PO# 551515-1 ONGOING Construction work for YASREF Nitrogen line Project at DPL. COMPLETED, YASREF CS Gate visitor parking work at YANSAB-SABIC- PO# 4300618702 ONGOING CS lamping services at YANSAB (SABIC-affiliate) PO#43000390416. COMPLETED, SABIC CS lamping services at YANSAB (SABIC-affiliate) PO#43000390416 ONGOING Dismantling of Rack including lighting from old warehouse and installation lighting at WH #01-YASREF. COMPLETED, YASREF Dryer Installation and Shutdown Works at El Khayyat Gypsum Plant –Yanbu COMPLETED, EL-KHAYYAT E&I work for Installation of Permanent to add Diesel additive CFPP at ANABEEB/ YASREF-MOC-172-TPC-160005. COMPLETED, YASREF EMR PET DM washer unit findings work at IBN RUSHD -SABIC -PO#4300583600 COMPLETED, SABIC Erection of 20000M2 Pre Engineering Building of KAFA steel at Yanbu COMPLETED, OTHER Erection of Natural Gas line and By pass line at UEC.Co-YANBU COMPLETED, OTHER Expansion work of Nagadi Performed Concrete Factory COMPLETED, OTHER Fabrication and Erection for structural Works at TAYSEER AL SHEIKH PHOSPHATES PRODUCTS FACTORY. COMPLETED, OTHER Fabrication and Erection of two Warehouses (1800 M2 ) in Arab Malaysian Vegetable oil co. Yanbu COMPLETED, OTHER Supply and Installation of boundary wall at El Khayyat Co.YANBUFabrication and Installation of Crash Barrier with IPE300 at El Khayyat Gypsum Plant –YANBU COMPLETED, EL-KHAYYAT Fabrication and installation of damper support quantity 04 numbers at YANSAB (SABIC-affiliate) PO# 4300459096 COMPLETED, SABIC Fabrication and Installation of ERT Assembly Points, YAMA Staging and Entrance Board, Employees Assembly Points sign Boards for YANSAB Plant –SABIC- Affiliate – PO# 4500721601-July2009 COMPLETED, SABIC Fabrication and Installation of Pipe line and Hopper with suction at UNITED MINING INDUSTRIES (UMI-YANBU) COMPLETED, OTHER Fabrication and installation of piping spool and access platform at YANSAB (SABIC-affiliate) PO# 4300459097 COMPLETED, SABIC Fabrication and Installation of SS frames for Chimney doors of SEG4 MARAFIQ Plant. Yanbu COMPLETED, MARAFIQ Fabrication and installation of temporary support to hold CG line while cleaning in LLDPE plant YANSAB (SABIC-affiliate) PO# 4300473518. COMPLETED, SABIC FCB Air Compressor Room Civil and Construction work at United Mining Industries -PO# 551656-2 ONGOING Grouting work at Carbonate Company Ltd- Yanbu. PO# 06539-2 COMPLETED, OTHER HEG line replacement work at YANSAB-SABIC- PO# 4300673296 ONGOING Installation and alignment of Equipment for DRY-MIX plant at El Khayyat Co. YANBU COMPLETED, EL-KHAYYAT Installation of 6” By Pass Gas line Network. (MARAFIQ- Line) at UGC Co COMPLETED, OTHER Installation of Additional Gas Detector, Modification of Existing Interlock 46-S-731 in HDPE & Installation of Gas Detector in PHU LPG Shelter at YANSAB (SABIC-affiliate) PO#4504595171. COMPLETED, SABIC Installation of Aluminum Cladding works at OLAYAN DESCON ENGINEERING COMPLETED, OTHER Installation of Bypass Line for Bagging Machine HP-4261B in YANSAB (SABICaffiliate) PO# 4300473525. COMPLETED, SABIC Installation of composite sampler line and foundation at MARAFIQ plant – Yanbu. (PO # 11-2384-170-3881- Sub Contract) COMPLETED, MARAFIQ Installation of Concrete slab Pavement at YANSAB Gate No.4 &Permanent Sample Cabin for YASREF Project at Yanbu. COMPLETED, YASREF Installation of Curb stone and Paving Walkway at MC-3 COMPLETED, YASREF Installation of Gypsum Handling System at United Mining Industries –YANBU COMPLETED, OTHER Installation of platform Valve Access at YANSAB (SABIC-affiliate) PO#4300497518 COMPLETED, SABIC Installation of STUCCO conveying Pipe line at United Mining Industries –YANBU COMPLETED, OTHER Installation works for 13 each 55kv pumps at Royal Commission Hospital with the electrical modification work COMPLETED, OTHER Installing glass windows for lab doors in YANSAB (SABIC-affiliate) PO# 4300471012. COMPLETED, SABIC Insulation of stainless steel mesh of the Quench water storage tank with TECHNIP at YANSAB plant.(SABIC-Affiliate) COMPLETED, SABIC Insulation works on main pipe line’s with RB Hilton at YANSAB projects (SABICAffiliate) COMPLETED, SABIC Lay Down Utilities package at BONATTI S.P.A BRANCH-SP-4 COMPLETED, YASREF Lying of buried cable including hand excavation and backfilling at MARAFIQ plant -Yanbu. (PO # 11-2449-170-3881- Sub contract) COMPLETED, MARAFIQ Maintenance Electrical work at MaSa (MARAFIQ) PO# 9100025610 COMPLETED, MARAFIQ Maintenance of warehouse at YANSAB plant (SABIC- Affiliate) PO# 4501123693- Oct 2011 COMPLETED, SABIC Maintenance repair and operation of refrigeration, air conditioning, and heating devices in an educational building in Yanbu ( Ministry of Education) -PO# 230401085997 ONGOING Maintenance Repair and Operation of the educational building ( Ministry of Education) 03 Years contract PO# 221001065005 ONGOING Maintenance work at IBNRUSHD Plant (SABIC-affiliate) PO# 4300035355. COMPLETED, SABIC Maintenance work at YANSAB Plant (SABIC-affiliate) PO# 4502459762. COMPLETED, SABIC Manual Excavation works (25000M3) at DODSAL Co.YANBU (56” EWG-2 Loop-2 and 56” KAEC Pipeline Project – SAUDI ARAMCO) COMPLETED, OTHER Modification of Potable Taker to Potable Water Vacuum Suction Truck – MaSa (MARAFIQ) Yanbu. PO# 9100025729 COMPLETED, MARAFIQ New Dry cutting dust collector pipeline work United Mining Industries at YANBU COMPLETED, OTHER New fire pump house cable pulling and termination work at United Mining Industries -PO# 511984-3 COMPLETED, OTHER New Security Shed at Entrance of Security Gate # 1. Fabrication, supply and Installation of structural space frame shade steel space frame for Rabigh Refining and Petrochemicals. COMPLETED, RABIGH Noise level Reduction Project at CMB workshop (YANSAB- PO # 4300251452- 2019. COMPLETED, SABIC Office and Toilet work restoration at Arabian United Float Company (AUFG) COMPLETED, OTHER Office Utilities Package at BONATTI S.P.A BRANCH SP-4 COMPLETED, YASREF Operation and Maintenance of MYAS Irrigation Distribution main line Piping and Structural jobs for Butterfly/Isolation Valve Chamber, wash out Valve Chamber, Air releases Valve Chamber of Royal Commission Yanbu COMPLETED, OTHER PHU Roof Repair work at YANSAB (SABIC-affiliate) PO# 4300538821 COMPLETED, SABIC Pipes installation for IWW discharge to MARAFIQ(UFG) COMPLETED, OTHER Platform work for New WET additives work United Mining Industries -PO# 551412-8 COMPLETED, OTHER Preparation of Warehouse 1,2 &3 at BONATTI S.P.A BRANCH –SP-4 COMPLETED, YASREF RCC Beam for Micro Piling at T5 for YASREF Project at Yanbu COMPLETED, YASREF Rectification of water channel work at GAS-Yanbu (SABIC affiliate) PO #4300556428 COMPLETED, SABIC Rehabilitation of line maintenance building (Toilets, Kitchen, store with new Corridor) COMPLETED, MARAFIQ Rehabilitation of vinyl tiles MaSa (MARAFIQ) COMPLETED, MARAFIQ Relocation of portable cabin at GAS plant (SABIC- Affiliate) PO# 4500807898-Jan2010 COMPLETED, SABIC Rental Dyna and Forklift Supply at YANSAB Plant. COMPLETED, SABIC Rental for SNC Lavalin Europe B.V Branch 5.1/H Skid Mounted Steam Boiler, 45 KVA Diesel Driver COMPLETED, OTHER Repair of mixer shaft IWTP II COMPLETED, MARAFIQ Replace Drinking water piping work at YANSAB-SABIC- PO# 4300683798 ONGOING Replacement of PVC pipes of the IWW project by HDPE work at Arabian Float Glass Company (AUFG) PO# 000020297 ONGOING Replacement of the upper bearings screw pumps at IWTP11- MaSa (MARAFIQ) PO# 9100025646 COMPLETED, MARAFIQ Restoration and modification (Civil Work) at Masa (MARAFIQ) PO# 9100025005 COMPLETED, MARAFIQ RTR Pipe Road crossing concrete slab at YASREF (MC-3) Project-Yanbu- AlShalawi International Holding Company COMPLETED, YASREF Sand Blasting Job FGD ABSORBER INLET FLUE GAS DUCT at STG4 MARAFIQ plant –Yanbu COMPLETED, MARAFIQ Shifting of Fire Hose Reel at YANSAB (SABIC-affiliate) PO#4300502384 COMPLETED, SABIC Shutdown work for Acetic Acid at IBN RUSHD plant (SABIC- Affiliate) PO# 4500842342-Feb2010 COMPLETED, SABIC Shutdown work for Aromatic plant at IBN RUSHD (SABIC- Affiliate) PO# 4501002554- Feb 2011 COMPLETED, SABIC Shutdown work for CTA at IBN RUSHD plant (SABIC- Affiliate) PO# 4501195694-Feb 2012 COMPLETED, SABIC Shutdown work for CTA at IBN RUSHD (SABIC- Affiliate) PO# 4501019254- Mar2011 COMPLETED, SABIC Shutdown work for CTA/ PTA at IBN RUSHD plant (SABIC- Affiliate) PO# 4501076626- July 2011 COMPLETED, SABIC Shutdown work for GRIP project at YANPET – Yanbu COMPLETED, SABIC Shutdown work for GRIP project at YANPET – Yanbu. COMPLETED, SABIC Shutdown work for inspection Aromatic TA at IBN RUSHD plant (SABIC- Affiliate) PO# 4500747895 –Nov2009 COMPLETED, SABIC Shutdown work for PET and TA shutdown at IBN RUSHD plant (SABIC- Affiliate) PO# 4500716232-Jan2009 COMPLETED, SABIC Shutdown work for PET- TA shutdown at IBN RUSHD plant (SABIC- Affiliate) PO# 4500680930-Nov2008 COMPLETED, SABIC Shutdown work for polyester at IBN RUSHD plant (SABIC- Affiliate) PO# 4501200407 Feb2012 COMPLETED, SABIC Shutdown work for PTA at IBN RUSHD plant (SABIC- Affiliate) PO# 4501179176-Jan 2012 COMPLETED, SABIC Shutdown work for T/A at IBN RUSHD plant (SABIC- Affiliate) PO# 4501400778- March 2013- june-2014. COMPLETED, SABIC Shutdown work for YANSAB Plant-BBTX and EG (SABIC- Affiliate) PO# 4505459091 COMPLETED, SABIC Shutdown work for YANSAB Plant (SABIC- Affiliate) PO# 4501375674- Jan-2013 COMPLETED, SABIC Silo washing system D910&P910 (NATPET) COMPLETED, OTHER Site preparation package – Al-Shalawi International Holding Company – including surveying, leveling, backfilling material transportation from borrow pit to site, backfilling, compaction, testing and dumping out surplus material to outside the designated area of YASREF plant. MC-3 COMPLETED, YASREF Sound Attenuated Generator COMPLETED, OTHER Street light Installation of Phase II at Arabian United Float Company (AUFG) COMPLETED, OTHER Structural fabrication works TECHNIP YANSAB projects. (SABIC- Affiliate) COMPLETED, SABIC Supply and Installation of 2-Inch Isolation Valve and Modified Regulators for Gas Line work at United Mining Industries COMPLETED, OTHER Supply and installation of ARAMCO type V fence at SANKYU/YASREF chemical storage area. COMPLETED, YASREF Supply and Installation of boundary wall at El Khayyat Co.YANBU COMPLETED, EL-KHAYYAT Supply and installation of car parking shed at BONATTI S.P.A BRANCH –SP-4 COMPLETED, YASREF Supply and Installation of Fixed Bollard Post and Bump guard for reclamation yard at MC-3- Al-Shalawi International Holding Company COMPLETED, YASREF Supply and installation of HDPE LINEAR (UFG) COMPLETED, OTHER Supply and Installation of Insulation work at Saudi Carbonate Company Ltd- Yanbu. PO# 06076-3 COMPLETED, OTHER Supply and Installation of Inter connecting Pipe ways carbon steel at MC-3 – AlShalawi International Holding Company COMPLETED, YASREF Supply and Installation of lighting and cables work at YANSAB (SABIC-affiliate) PO#4300244508. COMPLETED, SABIC Supply and Installation of lighting and power & instrument cables work for communication systems at YANSAB (SABIC-affiliate) -2019 COMPLETED, SABIC Supply and installation of Mess Hall (828 M2) at satellite Area SP-4 COMPLETED, YASREF Supply and Installation of Road Blockers Chamber for MARAFIQ Plant-Yanbu (PO# Marafiq –y/usa-4- Sub Contract) COMPLETED, MARAFIQ Supply and Installation of Saudi Aramco Fence type 5 (1800 M) and 8 meter Double leaf bolted gate (4No;s) at SAUDI TECHINT LTD SP-3 COMPLETED, YASREF Supply and Installation of sun shades for Gate #25 & 26 COMPLETED, MARAFIQ Supply of manpower for BOTTERO Equipment installation of AGC-OGC coating Project at OBEKAN Glass Company- YANBU COMPLETED, OTHER Supply of Raw sodium Chloride (Raw Salt) at TRONOX Company. PO# 4501202410 COMPLETED, OTHER Temporary Site Offices works at SAUDI TECHINT SP-3 COMPLETED, YASREF Temporary works for site offices at NESIC- YERP (MC-2) Project- Yanbu COMPLETED, YASREF U-400 Bagging area roof fail repair work at CRISTAL Co.-YANBU COMPLETED, OTHER U300 Acidic off-loading station construction/ PO: 4200003717/4501016835 COMPLETED, OTHER UMI civil electro mechanical works for gypsum board plant expansion COMPLETED, OTHER Waterproofing of PCC room building in FCB plant work at United Mining Industries -PO# 550835 COMPLETED, OTHER